Main console prior to renovations |
|
|
|
|
|
|
|
|
|
|
|
|
Second Position prior to renovations |
|
|
|
|
|
|
|
|
|
|
|
|
Alarm area prior to renovations |
|
|
|
|
|
|
|
|
|
|
|
|
The new Radio Control Stations in the process of being installed |
|
|
|
|
|
|
|
|
|
|
|
|
Demolition begins, Dispatch is moved out and equipment is being removed |
|
|
|
|
|
|
|
|
|
|
|
|
The fire alarm panel is removed |
|
|
|
|
|
|
|
|
|
|
|
|
The temporary dispatch setup while the renovations are completed |
|
|
|
|
|
|
|
|
|
|
|
|
The CJIS setup un the temporary location |
|
|
|
|
|
|
|
|
|
|
|
|
Demolition and removal of the old equipment continues |
|
|
|
|
|
|
|
|
|
|
|
|
An electrician removes wiring. The main dispatch console previously was located in the center of this picture. |
|
|
|
|
|
|
|
|
|
|
|
|
|
This corner formerly housed the second dispatch position and all alarm equipment. |
|
|
|
|
|
|
|
|
|
|
|
|
The room receives a paint job and a new floor |
|
|
|
|
|
|
|
|
|
|
|
|
The room receives a paint job and a new floor |
|
|
|
|
|
|
|
|
|
|
|
|
The new furniture, built by Wrightline, and one E-911 position are moved in |
|
|
|
|
|
|
|
|
|
|
|
|
The new furniture, built by Wrightline |
|
|
|
|
|
|
|
|
|
|
|
|
|
The new radio equipment, build by IPC Orbacom is installed along with new monitors for internal computers |
|
|
|
|
|
|
|
|
|